Building Instructions
Filters:
Bag 10 - Light Show - FIRST LEGO League 2023-2024 MASTERPIECE
These are 3D Building Instructions for the Light Show mission model for the FIRST LEGO League 2023-2024 MASTERPIECE competition.
- #1679
- 09 Aug 2023
Bag 6 - Music Concert Lights And Sounds - FIRST LEGO League 2023-2024 MASTERPIECE
These are 3D Building Instructions for the Music Concert Lights And Sounds mission model for the FIRST LEGO League 2023-2024 competition.
- #1673
- 09 Aug 2023
Bag 9 - Sound Mixer - FIRST LEGO League 2023-2024 MASTERPIECE
These are 3D Building Instructions for the Sound Mixer mission model for the FIRST LEGO League 2023-2024 MASTERPIECE competition.
- #1675
- 09 Aug 2023
Bag 4 - Masterpiece - FIRST LEGO League 2023-2024 MASTERPIECE
These are 3D Building Instructions for the MASTERPIECE mission model for the FIRST LEGO League 2023-2024 MASTERPIECE competition.
- #1672
- 09 Aug 2023
FLL 2022: Bag 13 - Instructions for Toy Factory Mission Model - FIRST LEGO League 2022-2023 SUPERPOWERED Challenge
3D building instructions for the Toy factory mission model from the FIRST LEGO League 2022-2023 competition. Find the parts in Bag 13
- #1547
- 09 Aug 2022
FLL 2022: Bag 06 - Instructions for Hybrid Car Mission Model - FIRST LEGO League 2022-2023 SUPERPOWERED Challenge
The Hybrid car and the Ramp are part of mission 6 from FLL 2022. Find the parts in Bag 6 and assembly the model following this 3D building instructions
- #1542
- 09 Aug 2022
FLL 2022: Bag 11 - Instructions for M11 Hyrdoelectric dam - FIRSTLEGO League 2022-2023 SUPERPOWERED
3D Building instructions for the FIRSTLEGO League 2022 mission model called Hydroelectric dam. Find the parts in Bag 11
- #1580
- 09 Aug 2022
FLL 2020: Attachment for Boccia mission
This is a LEGO Education SPIKE Prime robot attachment for accomplishing the FIRST LEGO League 2020 Replay Boccia mission . The attachment is designed for Gazon, LEGO Education SPIKE Prime competition robot.. With this attachment we follow the line with the robot until we reach the team mission and we use the lever on the top to push the blue box. Then we follow the line to reach the Boccia mission, and three things happen: 1. align to the mission model with the front of the attachment, 2. turn the lever to release the green boxes and 3. move the lever to push on the mission model. This is a complex mission requiring a lot of coordination from the robot. Quite interesting I must say.
- #1331
- 06 Jul 2021
FLL 2019: Attachment To Accomplish The City Shaper Elevated Place (01) Robot Game Mission
This is the attachment to accomplish Fll 2019 M01 mission with the Whakatae. You can see how to attach the attachment to the robot in this tutorial.
- #1137
- 28 Sep 2020
Bag 3 - Bench - FIRST LEGO League 2020-2021 RePLAY
These are instructions on how to build the:
- Bench
You can find more building instructions and tips and tricks about the competition on this page.
- #1082
- 31 Aug 2020
Bag 5 from FIRST LEGO League 2019-2020 City Shaper Challenge
These are instructions on how to build the:
- Red Building Units
for the FIRST LEGO League 2019-2020 City Shaper Challenge.
You can find more building instructions and tips and tricks about the competition on this page.
- #853
- 21 Aug 2019
Datalog of the Gyro sensor when moving forward and keeping the orientation straight
The data log from the experiment when moving forward and keeping straight with an implementation for Proportional compensation.
- #389
- 10 Jan 2018
- 1
Coach Pins, Penalties and Meteoroids For FLL 2018 Into Orbit Challenge
FIRST® LEGO® League mission requirements need to be achieved by your robot through its programs and its use of equipment. You’re allowed to hand-rescue your robot, but that does cause this penalty. Be sure to pay extra attention to the rules where they talk about “Interruptions"
Penalty
- If you interrupt the robot: minus 3 each time
- Possible penalty totals: −18, −15, −12, −9, −6, −3, 0
Scoring Requirements
- Interruption needs to be observed by the referee.
- Upon penalty, the referee will place one penalty disc in the southeast triangle as a permanent interruption marker.
- You can get up to six such penalties.
- If a penalty disc comes off the triangle, it is simply returned, with no effect on score.
(mission descriptions source https://www.first-lego-league.org/)
- #540
- 01 Jan 2016
Bag 8 - Movie Set - FIRST LEGO League 2023-2024 MASTERPIECE
These are 3D Building Instructions for the Movie Set mission model for the FIRST LEGO League 2023-2024 MASTERPIECE competition.
- #1674
- 09 Aug 2023
Glide attachment frame for Chain Monster
The Chain Monster is one of the coolest Box Robots that we've built. But what is a robot without attachments that can accomplish missions? These here are 3D building instructions demonstrating how the frame for the robot could be built. We've discussed frames in the Box Robots courses for EV3. Take a look at this one. See if it can inspire you to build robots and attachments in certain way to achieve consistent and reliable robot behavior.
- #1666
- 09 Aug 2023
FLL 2022: Bag 2 - Instructions for M03 Energy Storage - FIRSTLEGO League 2022-2023 SUPERPOWERED
3D instructions for the Energy Storage mission from the FIRST LEGO League 2022-2023 mission model. Parts are in Bag 4 from the set
- #1537
- 09 Aug 2022
FLL 2022: Bag 10 - Instructinos for M10 Power plant - FIRST LEGO League 2022-2023 SUPERPOWERED
3D building instructions for the Power plant mission model from the FIRST LEGO League 2022 SUPERPOWERED competition. Find the parts in Bag 10
- #1581
- 09 Aug 2022
Bag 3 - Fuel Truck - FIRST LEGO League 2022-2023 SUPERPOWERED
- #1539
- 09 Aug 2022
Top attachment from LEGO MINDSTORMS Robot Inventor, with building instructions
This is an attachment for the top of the robot and the attachment is used for lifting different parts. It is reusable as we could change the lever and use the attachment for a number of different missions.
- #1455
- 29 Apr 2022